A Rowan company - serving Arlington, TX
A home with a brand-new roof and gutters at golden hour
GAF · Arlington

GAF Roofing in Arlington, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Arlington
A new clay tile roof
A newly finished roof with a ridge vent and step flashing
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

GAF Roofing in Arlington: What to Know First

We install and repair GAF roofing in Arlington as an independent GAF service provider, and most repairs are quoted and scheduled within a few business days of your free estimate – no same-day promises on planned work, because nobody replaces a roof in an afternoon. Typical GAF roof repairs run $400 to $1,800; full replacements run $8,000 to $20,000 depending on pitch, square count, and whether the deck is sound. The price is written down before anyone touches your shingles, with a written scope and warranty attached.

Call (844) 761-7521

This page is for Arlington homeowners whose roof carries a GAF label – Timberline HDZ, Timberline UHDZ, Grand Sequoia, or an older Timberline A/S install – and who want to know what fails, what it costs, and what the fix actually involves. Call (844) 761-7521 for a free estimate.

How GAF Products Fail – and How We Fix Them

GAF shingles are good products, which is why their failures look different from cheap laminate roofs. They rarely fail all at once. They fail at the details – the ridge, the valley, the penetration boots, the flashing – and the pattern tells you what’s actually wrong.

  • Granule loss concentrated in the south-facing slope, plus curling at the bottom edge of Timberline HDZ. In Arlington’s summer heat – routinely 100°F and above for weeks – shingles expand and contract more than in cooler markets. Granule loss along the south and west slopes is often heat-driven rather than a manufacturing defect, and curl at the bottom 3-4 courses usually means the shingles are at end of life on that plane. We measure deck temperature and shingle age before recommending a fix, so we’re not selling you a new roof when five squares of replacement shingle will do.
  • Ridge and hip cap failure on Timberline UHDZ installs. The deeper profile provides more wind resistance but also more surface for granules to shed at the ridge – and the ridge is where the ridge vent meets the cap. If the ridge vent was undersized or the cap nailed high, you’ll see premature wear at the crown. We pull the cap, inspect the vent, and replace cap shingles with a system matched to your actual vent spec.
  • Valley wear on Grand Sequoia and designer-profile roofs. The larger shingle footprint sheds water well but leaves more exposed valley metal or membrane. In an Arlington spring with 4-6 inches of rain in a 24-hour stretch, that’s the first place a leak shows up – usually at the head of a valley where the underlayment laps the wrong way. We open the valley, correct the lap direction, and re-lay the shingle layer.
  • Pipe boot and step flashing failure. The rubber boot on a 3-inch or 4-inch plumbing penetration dries out and cracks after 12-15 years, and the crack is invisible from the ground. We replace the boot with a new EPDM boot and re-set it, then check the step flashing at every wall intersection – the flashing, not the shingle, is usually what’s letting water in.
  • Nail pop and blow-off after a hailstorm or high-wind event. GAF’s wind ratings are real, but they’re rated to the installation. If the underlayment wasn’t laid flat or the nails hit at the wrong depth, the shingle can lift. We map the failure, document it with photos, and tell you whether a repair or a full replacement is honest work.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our GAF Roofing Process

Every GAF job follows the same six steps, whether it’s a $400 boot replacement or a $20,000 replacement:

  1. 1
    Free roof inspection with a photo record. We walk the roof, photograph every plane and penetration, measure layer count, and check the deck and underlayment through attic access where we can. You get the photos – documented, not optional.
  2. 2
    Written price and scope before any work starts. Flat price, written scope, written warranty – under Clause 1 of The Haven Standard, the number is delivered before anyone picks up a hammer, and it doesn’t move once work begins.
  3. 3
    Parts decision – OEM or quality aftermarket. On a GAF roof we default to GAF OEM components where they’re available and the warranty matters most: system-matched underlayment, ridge vent, and starter strip. Where aftermarket is functionally identical – boots, nails, drip edge – we use quality aftermarket and pass the savings to you. We tell you which is which.
  4. 4
    The repair or installation. Crews are background-checked and uniformed, and every material is staged before work starts so no one’s making a mid-job run and guessing.
  5. 5
    The test. We water-test repairs where the roof design allows, check every penetration by hand, and confirm the new layer sits correctly over the old one at every transition.
  6. 6
    Cleanup and the 365-Day Done Right Promise. Magnet sweep, debris haul-off, final photo record. If anything is not done right within the first year, we come back and fix it – backed by The Haven Standard, not a handshake.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What GAF Roofing Costs in Arlington

New architectural shingles with a clean valley

GAF repair and replacement pricing depends on square count, pitch, deck condition, and how many layers are already on the roof. Here are the ranges we write on Arlington estimates:

Job Typical price range
Roof repair (single area, boots, flashing, shingle patches) $400 – $1,800
Full GAF roof replacement (asphalt shingle) $8,000 – $20,000
Metal roof installation $15,000 – $40,000
Tile roof repair $600 – $2,500

The biggest price swing is deck condition: a Timberline replacement over a sound deck is the lower end of that range, but if the deck has rot or a second shingle layer needs removal first, you’re closer to $20,000. Pitch above 8/12 adds cost. So does vent and flashing work at the ridge and walls. The written quote breaks it out line by line – no lump-sum surprises. Call (844) 761-7521 for a free estimate with a written price.

Why Arlington Homeowners Call Rowan Construction Group Arlington for GAF Work

We’re an independent GAF service provider – not affiliated with or authorized by GAF – and our whole pitch is the documented record. Under Clause 1 of The Haven Standard, the price is written before anyone starts. Our technicians have up to 19 years of experience on GAF systems, and they know the difference between a Timberline HDZ wear pattern and an installation error, which means you get a repair recommendation based on the actual condition instead of a replacement quote on a hunch. Every visit comes with a photo record, and background-checked uniformed crews show up when we said they would – with a live person answering your call around the clock.

Sourcing depth matters too. We work across fifty-plus vetted brands – GAF and Owens Corning roofing, KraftMaid and Wellborn cabinets, Kohler and Toto fixtures, PGT windows, Master Halco fencing, Belgard and Techo-Bloc pavers – so the written quote reflects honest numbers rather than inflated ones. Free second opinion on any competitor estimate, line by line, no charge. The 365-Day Done Right Promise covers the work; if it isn’t right, we make it right.

FAQs

Roofers installing a new roof with safety harnesses

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA second-story addition that matches the existing rooflineA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Arlington

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Arlington team

A local vetted partner works across Arlington and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-7521
Local Service Coverage

Request a Free Estimate in Arlington

Tell us what you need - Rowan Construction Group Arlington responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch