AfterWhat It Costs to Hire a General Contractor in Arlington, TX
Hiring a general contractor in Arlington usually costs 15% to 25% of your total project price as the GC’s fee, on top of materials and labor. On a $40,000 kitchen remodel, that’s roughly $6,000 to $10,000 in contractor markup. But in Arlington’s older homes, the fee is almost never what blows up the budget. It’s the code-upgrade work the pre-permit inspection uncovers. Rowan Construction Group Arlington quotes a flat written price before any work starts and itemizes that remediation up front. Call (844) 761-7521 for a free estimate.

Why the Contractor’s Fee Isn’t Your Real Cost Risk in Arlington
Arlington’s building department requires a pre-permit inspection on any home built before 1980, and about 60% of the city’s housing stock qualifies. That inspection is where remodel budgets get rewritten. A homeowner who budgeted $40,000 for a bathroom comes back from the inspection with a $4,000 to $12,000 code-upgrade line they never saw coming.
So there are two separate costs sitting in every Arlington remodel, and mixing them together is what produces the sticker shock:
- The GC fee. A markup of 15% to 25% on the project, covering management, scheduling, permits, and the contractor’s margin. Predictable, negotiable, and easy to compare between bids.
- Mandatory remediation. The cast-iron, galvanized, or aluminum-wiring work the pre-1980 inspection triggers. This is where totals swing by thousands.
A GC service page that quotes only the first number is telling you half the story. Under Clause 1 of our Haven Standard, the written price comes before anyone picks up a tool. That price includes a conditional remediation estimate as a named line item before we pull a single permit.
The Remediation Costs Most Arlington GC Pages Leave Out
These are the numbers a written quote should carry on the page, in dollars, so you can screenshot them and compare.
| Remediation Item | Typical Arlington Cost |
|---|---|
| Galvanized supply-line re-pipe (1,500 sq ft ranch) | $3,500-$7,000 |
| Aluminum branch-wiring remediation (pigtailing or panel upgrade) | $1,800-$5,500 |
| Cast-iron drain replacement (per run, once slab is opened) | Quoted as a conditional line item |
| Foundation pier-and-beam leveling (before cosmetic work) | Quoted per the engineer’s report |
North Arlington and the east side, especially the 76013 and 76014 ZIP codes, hold the highest concentration of pre-1980 homes. Owners there should treat remediation as a near-certain cost, not a rainy-day contingency. Along the east side, the 1960s and 1970s ranch homes often still have original cast-iron sewer lines that crack at the joint fittings under the slab. Open the floor for a bathroom remodel and a re-pipe job comes with it.
Arlington sits on clay soils that swell and shrink through the region’s wet and dry swings, so foundation movement shows up as a routine construction item, not a rare one. Hot summers also push older homes toward attic ventilation and radiant-barrier upgrades. None of this is optional once a permit is in play. It belongs in the quote from day one.

How Rowan’s Written Quote Handles the Surprise
Rowan Construction Group Arlington quotes every project as a flat written price with a written scope and a written warranty. The remediation estimate sits inside that scope as a conditional line item: we name the likely work, give you the dollar range, and tell you what triggers it. If the pre-permit inspection changes the picture, no scope change proceeds until a change order is signed. That discipline is the reason our projects finish within a few percent of the number the customer agreed to, across 4,000-plus jobs since 2007.
What arrives with the crew is part of what you’re paying for. Our technicians have up to 19 years of experience, and they’re background-checked and uniformed, with a live person answering calls 24/7. Every visit ends with a documented photo record included as standard, not an upgrade. Bring a competitor’s estimate and we’ll review it line by line at no charge as a free second opinion.
What Different Arlington Projects Actually Cost
Here’s what the trades look like in dollars, so you can see where a GC fee lands. These are the project totals before the contractor’s markup is folded in.
- Kitchen remodel: $14,000-$45,000 (small kitchen: $9,000-$20,000)
- Bathroom remodel: $9,000-$28,000 (small bathroom: $5,000-$12,000)
- Home addition: $45,000-$130,000
- ADU construction: $90,000-$220,000
- Garage conversion: $30,000-$80,000
- Roof replacement: $8,000-$20,000
- Impact window installation: $8,000-$25,000
- Paver driveway installation: $7,000-$18,000
Fixture selection moves these numbers less than you’d think, but it’s worth naming brands where they sit. A Kohler or Moen fixture package is a known quantity in a written quote; a vague “allowance” is not. On countertops, we source Cambria and Caesarstone, and cabinets from KraftMaid and Wellborn. Our sourcing runs across fifty-plus vetted brands, which is what lets the written quote carry honest numbers rather than padded ones. Start with our home page to see all seven trades and how each one is quoted.
How to Read a GC Bid in Arlington
Ask each contractor two questions before you compare totals: is the remediation on pre-1980 systems itemized, and is there a signed change-order rule in writing? A bid that answers yes to both lets you compare apples to apples. A bid that answers neither is quoting you a number it already knows might move.
Every Rowan project carries the 365-Day Done Right Promise, backed by The Haven Standard and printed on the page, not buried in an asterisk. If it isn’t done right, we make it right. No-hassle upfront pricing means the number is written before work starts on every trade, from kitchen remodeling through home additions and ADUs. That’s the whole point of a documented record over a handshake.
FAQs
Expect 15% to 25% of your total project cost as the GC fee; on a $40,000 kitchen that’s about $6,000 to $10,000. In Arlington’s pre-1980 homes, add $1,800 to $7,000 or more for the code remediation the pre-permit inspection can trigger. Call (844) 761-7521 for a written price that itemizes both.
Because the pre-permit inspection required on homes built before 1980 uncovers cast-iron drains, galvanized supply lines, or aluminum wiring that wasn’t in the original bid. A quote that names those as conditional line items up front keeps the final number close to the one you agreed to. Call (844) 761-7521 and estimates are free.
Replacing galvanized supply lines ($3,500-$7,000 on a 1,500 sq ft ranch) is usually cheaper than repairing them piece by piece and reopening walls later. Once the slab or wall is open for a remodel, a re-pipe run costs far less than a standalone job. Call (844) 761-7521 for an exact quote.
Bring any written estimate and we’ll review it line by line at no charge, often the same day, with a live person answering calls 24/7. We’ll point out missing remediation lines and pricing gaps before you sign. Call (844) 761-7521 to schedule.
Get Your Written Price Before Anyone Starts
Rowan Construction Group Arlington puts the number in writing before work begins: the GC fee, the project scope, and the conditional remediation, all itemized. If a bid you’re holding has gaps, send it over for a free second opinion. Call (844) 761-7521 for a free estimate and a documented photo record on every visit.
Written by the team at Rowan Construction Group Arlington, serving Arlington, TX.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Fence and retaining wall along a sloped boundary. They photographed the footing depth at each post, which mattered when the county inspector came."
- Iona F.