







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Kitchen Remodel Costs in Arlington, TX (And What Local Quotes Usually Leave Out)
Kitchen remodels in Arlington run $14,000 to $45,000 for a full gut, with small kitchens landing at $9,000 to $20,000 when the layout stays put. The real number depends on what’s behind your walls: in a 1970s tract kitchen, opening up to install new cabinets almost always exposes galvanized supply lines and a cast-iron drain stub that Arlington’s code requires be replaced before the new boxes go in. Call (844) 761-7521 for a written price before any work starts.
Most homeowners in Arlington start with a quote around $28,000 and finish closer to $34,000. Nobody lied. The gap is plumbing and wiring that couldn’t be seen until the cabinets came off the wall. Our approach is to put a conditional line for that remediation in the written quote up front, before demo day, so there’s no surprise change order once the substrate is exposed.
Key Takeaways
- Full Arlington kitchen remodel: $14,000-$45,000; small kitchen: $9,000-$20,000.
- Pre-1980 homes almost always need re-pipe and drain work; that adds $3,500-$9,000 and must be in writing before demo.
- Rowan Construction Group Arlington inspects and photographs pipe condition before cabinets are ordered.
- Every change, from appliance swaps to added outlets, requires a signed change order with a dollar amount before work proceeds.

Why Arlington Kitchens Cost More Than the Quoted Number
Arlington’s housing was mostly built between 1950 and 1990, and the 1960s-70s ranch homes on the east side still have original cast-iron sewer lines that crack at the joint fittings under the slab. The supply side isn’t better: galvanized steel pipe has a service life of about 40 to 50 years, and most in Arlington has sailed past that. When you pull the original cabinets, you’re staring at both.
Arlington’s building department enforces a pre-permit inspection requirement for any work on pre-1980 homes, so material remediation becomes a standard line item rather than an optional fix. That’s how a $28,000 quote turns into a $34,000 invoice: not deception, just a hole in the wall that nobody budgeted for. We close that hole before it opens.
How Rowan’s Pre-Demo Inspection Works
Before we order a single cabinet, a technician opens one access panel and assesses the condition of the supply lines and drain. We photograph what we find. That photo becomes part of your documented project record, and you sign the remediation line item before any materials are ordered. It’s a small step, but it means the number on your contract is the number you pay. For the full scope of what we handle, see our Kitchen Remodeling page.
Arlington Kitchen Remodel Cost Breakdown
Here’s what the numbers look like line by line for a mid-size Arlington kitchen. These ranges are the same ones we write into quotes; nothing here is a “starting at” teaser.
| Line Item | Cost Range |
|---|---|
| KraftMaid full-access or Wellborn cabinets (by linear feet) | $8,000-$18,000 |
| Cambria or Caesarstone countertops (installed, per sq ft) | $55-$95/sq ft |
| Plumbing rough-in and re-pipe (if galvanized present) | $3,500-$7,000 |
| Electrical upgrade (AFCI circuits, new appliance circuits) | $1,200-$2,800 |
| Installation and finish | $6,000-$12,000 |
| Backsplash installation | $800-$2,500 |
| Kitchen island installation | $3,000-$10,000 |
| Cabinet installation only (no re-pipe) | $4,000-$13,000 |
Countertops are priced by the square foot because that’s how the slab is sold, and Cambria and Caesarstone are both engineered quartz: non-porous, no sealing, consistent from slab to slab. If you want to see how these numbers shift with layout changes, our home page has the wider view of what we build.

Cabinet Sourcing: What KraftMaid and Wellborn Actually Get You
Generic quotes list “custom cabinetry TBD,” which tells you nothing. We line-item cabinets by SKU in the written quote, because the difference between a $8,000 kitchen and an $18,000 one is largely which boxes you choose.
KraftMaid’s full-access line uses dovetail-drawer boxes, and we order it through our vetted distributor on a 10-day lead time. Wellborn’s all-plywood construction is our mid-price alternative, and for homeowners who care about what’s behind the drawer front, it’s the specification worth comparing against. Cabinets in a typical Arlington kitchen land between $8,000 and $18,000 depending on linear feet and door style.
- KraftMaid full-access: dovetail drawer boxes, 10-day distributor lead time, line-itemed by SKU.
- Wellborn: all-plywood construction, mid-price, strong for humid Texas kitchens.
- Sterling and Grohe fixtures: specified by model number when the sink and faucet are part of the scope.
Every cabinet brand, every fixture, and every slab gets a model number on the quote, so the price you compare is the price for exactly those materials. No “or equal” substitutions after the fact.
What Change-Order Discipline Does to Your Final Invoice
Scope creep is where kitchen budgets actually break, and it rarely arrives all at once. An appliance upgrade here, a tile pattern change there, a couple of added outlets in the island. Each one is small. Together, they’re the difference between a $28,000 job and a $36,000 one.
Under the Haven Standard, no change proceeds until the change order is signed with a dollar amount attached. If you want the Bosch dishwasher instead of the basic model, you see the number, you sign, we order it. If the tile pattern adds labor, you see the number, you sign, we lay it. That single discipline is why our projects finish within a few percent of the agreed cost. It’s also why the 365-Day Done Right Promise can be printed on every quote without an asterisk: if it isn’t done right, we make it right, and the terms are in writing.
Electrical work in Arlington’s older homes deserves its own note. Pre-1980 aluminum branch wiring doesn’t play well with the new AFCI circuits a modern kitchen needs, and an electrical panel or wiring upgrade is a job for a licensed electrician, not a homeowner with a weekend and a video. We flag it in the inspection, price it in writing, and schedule it as part of the sequence.
Frequently Asked Questions
A full kitchen remodel in Arlington costs $14,000 to $45,000, and a small kitchen where the layout stays the same runs $9,000 to $20,000. The wide range comes down to one question: does your pre-1980 home need a re-pipe or drain replacement once the walls open up? That adds $3,500 to $9,000 and should be in the written quote before demo. Call (844) 761-7521 for an exact figure on your kitchen, free of charge.
Rarely, in an Arlington kitchen built before 1980. The original cabinets are usually built around the galvanized supply line and cast-iron drain stub, so removing them exposes pipe that’s past its 40-to-50-year service life. If the inspection shows sound pipe, you can skip the re-pipe and save the cost. If not, Arlington’s pre-permit inspection requirement means the fix has to happen before new cabinets go in. We photograph what we find so you can see the condition before you decide.
Yes, on every trade and every job. You get a flat written price with a written scope and a written warranty before anyone picks up a tool. If a change is needed mid-project, you see the dollar amount and sign a change order before we proceed. Bring a competitor’s estimate and we’ll review it line by line at no charge through our free second-opinion offer. Call (844) 761-7521 to get started.
A typical full remodel takes six to ten weeks, with the cabinet distributor’s 10-day lead time factored into the schedule. The pre-demo inspection adds a day up front and often saves weeks later by catching re-pipe needs before they turn into a mid-project stall. Your written scope lists the sequence and dates so you’re never guessing. Call (844) 761-7521 to schedule an inspection and get your written price.
If you’re weighing a repair against a full replacement, the honest answer usually comes down to cabinet boxes and plumbing condition, not aesthetics. We’ll tell you which one your kitchen actually needs, with the numbers on the page. Rowan Construction Group Arlington has delivered more than 4,000 projects since 2007, every one with a written price before work started and a documented photo record when the crew left. Our technicians have up to 19 years of experience, crews are background-checked and uniformed, and a live person answers every call.
Call (844) 761-7521 for a free estimate on your Arlington kitchen remodel. You’ll get a written price in dollars, the conditional remediation lines spelled out in advance, and a documented record of everything we found and fixed.
Written by the team at Rowan Construction Group Arlington, serving Arlington, TX.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Fence and retaining wall along a sloped boundary. They photographed the footing depth at each post, which mattered when the county inspector came."
- Iona F.












