Last updated November 18, 2026








Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
How Long Does Windows & Doors Take? Timelines and What to Expect
A standard double-hung window replacement takes 45 to 90 minutes once the installer is on site. The window itself may have been ordered six weeks before that morning. That order date, not the installation date, is the real project start, and it’s the number most contractors leave out of the conversation. We’ve watched Arlington homeowners plan a two-day project that quietly becomes a seven-week one because the lead time was buried in a line item. This guide separates the installation timeline from the material timeline, stage by stage, so you can plan around the gap instead of discovering it.
Quick Answer
A typical window replacement project in Arlington takes 4 to 9 weeks from signed quote to final walkthrough: 1 to 2 visits to measure and quote, 3 to 8 weeks of manufacturer lead time, and then 45 to 90 minutes of installation per window on the day. Pre-hung exterior doors run 2 to 3 hours each on install day. The single biggest variable is lead time, and it’s set by the manufacturer, not the contractor.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Table of Contents
- The Four Stages of a Window and Door Project
- Why Lead Times Vary So Much Between Manufacturers
- Do You Need a Permit in Arlington?
- What Installation Day Actually Looks Like
- How Long Do Exterior Doors Take?
- The One Delay Homeowners Create Themselves
- Final Inspection and Punch List
The Four Stages of a Window and Door Project
Every replacement project moves through four stages, and only one of them involves tools. Breaking the timeline into stages is the difference between a realistic schedule and a surprise. Here’s how the four stages typically run for an Arlington home:
- Measure and quote (1 to 2 visits over about 1 week). An installer measures every opening, checks the existing frame and sill condition, and confirms glass options. You receive a written price and written scope before any work is scheduled.
- Order and lead time (3 to 8 weeks). The manufacturer builds the units. This is the long stage, and it varies most between projects.
- Installation day (45 to 90 minutes per window; 2 to 3 hours per pre-hung exterior door). Crews remove the old unit, prep the opening, set the new unit, flash and caulk, and finish the interior trim.
- Final inspection and punch list (same day or next business day). You walk the work, confirm operation and locks, and any touch-ups get logged.
For a whole-house project of 12 to 18 windows, that adds up to roughly 2 to 3 install days, on top of the wait for materials. If your project also includes broader exterior work, the sequencing matters; our Rowan Construction Group Arlington home page lays out how the trades connect on a single property.
Why Lead Times Vary So Much Between Manufacturers
Lead time is the number that surprises people, and it comes down to whether you’re ordering a stock size or a built-to-spec unit. A stock-size window from a major manufacturer like Andersen or Pella often ships in 2 to 3 weeks. A custom size, a nonstandard color, or specialized glass pushes into 6 to 10 weeks. That range is fixed, and no contractor can accelerate it.
Several factors move a unit from the short end to the long end:
- Custom sizing. Nonstandard dimensions mean a built-to-order unit, not a shelf pick.
- Specialized glass. Impact-rated glazing or a specific SHGC (solar heat gain coefficient) coating requires a separate production run.
- Color and finish. Exterior colors that aren’t stock add production time.
- Material. Fiberglass and clad units often take longer than standard vinyl because fewer lines run them.
- Season. Spring and early fall are the busiest order windows, and lead times stretch accordingly.
When we quote a project, the lead time for the specific unit is written into the scope, so you can see the 3-week number or the 8-week number before you commit. A written price and written scope before work begins is the whole point of how we operate. If a contractor quotes a “two-week project” on a custom order, ask which unit and which glass, because the answer explains the number.
Do You Need a Permit in Arlington?
Same-size window replacement in Arlington generally does not require a permit. Changing an opening, cutting a new one, or altering a structural header does, and that permitting step adds 5 to 10 business days to the critical path when inspection scheduling is included.
Here’s how the two paths compare:
- Like-for-like replacement: same opening, same size. Typically no permit. This is the fastest path.
- New opening or resized opening: requires a permit and inspection. Budget 5 to 10 extra business days.
- Structural header changes: engineered plans may be required, which adds review time before the permit is even issued.
Arlington’s housing stock spans a wide range, from mid-century homes near downtown to newer builds in the southern growth corridors, and the older homes often need more framing attention when an opening changes. That framing work is what triggers the permit, not the window itself. We pull the permits and schedule the inspections as part of the job; you don’t chase the city on your own.
What Installation Day Actually Looks Like
Installation day is the shortest stage of the project, but the sequence matters. A crew that skips a step will show it in the first hard Arlington rain. Here’s the order a quality whole-house installation follows:
- Interior prep and protection. Furniture covered, floors protected, work zones staged before anything is removed.
- Exterior flashing and removal sequence. Old units come out in a planned order, and flashing is staged so the opening is never left exposed longer than necessary.
- Unit installation. Each window is set, leveled, and secured.
- Foam and shim procedure. Shims carry the load; expanding foam seals the gap, applied in the right amount so the frame doesn’t bow.
- Exterior caulk. Sealed against water intrusion, which is the whole reason the flashing and caulk steps exist.
- Interior trim. Finished to match the existing trim profile where possible.
For a 15-window project, plan on 2 to 3 install days with a crew of two or three. A single door install fits comfortably in an afternoon. If your exterior project also involves a new fence or hardscape, timing the crews so they don’t collide is worth planning; our Fence Installation in Arlington page covers how those schedules interlock with window and door work.
How Long Do Exterior Doors Take?
An exterior door replacement takes about 2 to 3 hours to install for a pre-hung unit, and lead time follows the same manufacturer-driven pattern as windows: 2 to 4 weeks for a stock door, 4 to 8 weeks for a custom size or finish. A pre-hung door arrives in its frame, which is why the install is faster than it sounds; a slab replacement into an existing frame is quicker still, but you lose the benefit of a new frame and weather seal.
What adds time to a door project:
- Sidelights and transoms. Each additional glazed section extends install time.
- Rotted threshold or framing. Common in older Arlington homes exposed to years of summer heat and storm-driven rain.
- Custom finish or color. Adds 2 to 4 weeks to lead time.
- Hardware upgrades. Multi-point locks and specific handlesets add install time.
For a front door and a back door on the same house, we typically book them on the same day and allow 4 to 6 hours total.
The One Delay Homeowners Create Themselves
The most common self-inflicted delay is ordering custom windows before HOA approval comes back. In many Arlington communities, architectural review takes 2 to 4 weeks, and the committee can require a different exterior color or profile. If you’ve already ordered the unit, that change restarts the production line.
The fix is simple: submit the HOA application first, get written approval in hand, and only then place the order. The one to two weeks that adds up front is far shorter than a 6 to 10 week restart after a color change. We include the HOA submission step in the quote timeline for any property under a homeowners association, so the order date doesn’t outrun the approval date.
Final Inspection and Punch List
The final walkthrough happens the same day or the next business day. It’s where the work gets confirmed against the scope, and where the documentation matters most. We hand over a documented photo record from every visit, so you have evidence of the framing condition, the flashing, and the finished seal; not a verbal “all done.”
What the walkthrough covers:
- Every window and door opens, closes, and locks cleanly.
- Interior trim is finished and aligned.
- Exterior caulk lines are continuous and clean.
- Glass and screens are free of damage.
- Any touch-ups are logged and scheduled.
If something isn’t right, the 365-Day Done Right Promise means we make it right, backed by a written terms page, not a verbal assurance. For a larger project that also includes a new addition or an ADU, the window and door schedule needs to align with the framing and finish schedule; our Home Additions & ADU in Arlington page covers that sequencing in more detail.
Common Mistakes to Avoid
- Planning around install days and ignoring lead time. Installation is 2 to 3 days for a whole house; the wait is 3 to 8 weeks. Plan both.
- Ordering custom windows before HOA approval. A color change after order restarts production. Approval first, order second.
- Assuming a permit is needed when it isn’t. Same-size replacement in Arlington typically skips the permit, so confirm before you budget for one.
- Choosing a contractor on install-day speed alone. A 45-minute window install done without proper flashing will fail in the first storm season.
- Skipping the written scope. A price without a written description of the unit, glass, and trim leaves room for change orders later. Insist on both.
- Not scheduling the seasons. Arlington summers are hard on exterior crews; a July install in full sun is slower, and a project ordered in spring faces longer manufacturer lead times.
- Ignoring the existing frame condition. Rot found during removal can’t be quoted if it wasn’t inspected at measure. Ask what the installer expects to find.
See the difference
Before
After
Before
After
Before
AfterWhen to Call a Professional
A window or door project is worth calling a professional when the opening needs framing work, when you’re replacing more than one unit, or when the existing frame shows rot or water damage. High windows on a second story or over a vaulted ceiling are a height-work risk we don’t recommend tackling yourself. If you’re unsure whether your project needs a permit, the framing question is the deciding factor. Rowan Construction Group Arlington offers free estimates in Arlington; call (844) 761-7521 to schedule yours, and we’ll bring the written price and the written scope before we pick up a tool.
Frequently Asked Questions

A full window replacement in Arlington takes 4 to 9 weeks from signed quote to final walkthrough, with install day itself running 45 to 90 minutes per window. The bulk of that time is manufacturer lead time, not labor. Call (844) 761-7521 for an exact timeline on your specific project; estimates are free.
No contractor can shorten a manufacturer’s lead time, but choosing stock sizes instead of custom units can take a project from the 6-to-10-week range down to 2 to 3 weeks. The fastest path is a like-for-like replacement on stock-size units. Call (844) 761-7521 to see which option fits your openings.
Same-size window replacement in Arlington generally does not require a permit, while changing an opening or a structural header does. When a permit is required, inspection scheduling adds 5 to 10 business days. We handle the permit and inspection scheduling as part of the job.
Standard vinyl double-hung replacements in the Arlington market typically run a few hundred dollars per unit installed, with custom and impact-rated glass pushing higher, but the exact number depends on size, glass, and frame condition. We put a flat written price on every quote before work starts. Call (844) 761-7521 for a free estimate.
A pre-hung exterior door install takes about 2 to 3 hours, and lead time is 2 to 4 weeks for stock sizes and 4 to 8 weeks for custom. A front and back door on the same house usually fit in one 4-to-6-hour visit.
We inspect every unit at delivery before installation, and a damaged or wrong unit is reordered before install day rather than discovered mid-project. That inspection is part of why we log a documented photo record on every visit. Call (844) 761-7521 if you have a question about a unit already on order.
The Bottom Line
Window and door projects are two timelines stacked on top of each other: the install, measured in hours per unit, and the lead time, measured in weeks. In Arlington, plan 4 to 9 weeks end to end for a typical replacement, more if you’re ordering custom glass or changing openings. Get the HOA approval before you order. Confirm whether your project needs a permit. And insist on a written price and scope before anyone schedules a crew. That’s how a project lands where it was planned, not where the fine print pushed it.
Rowan Construction Group Arlington offers free estimates in Arlington. Call (844) 761-7521 to schedule yours; a live person answers, and you’ll have the number in writing before any work starts.
Written by the team at Rowan Construction Group Arlington.


