







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Arlington, TX
A tub-to-shower conversion in Arlington typically costs $4,800 to $11,500 depending on the tile, pan, valve, and whether the drain has to move. It’s the single bathroom project we’re asked about most in Arlington, and it’s the one where the written scope matters most, because what sits behind the old tub decides the real price. We do the plumbing, waterproofing, tile, and finish work as one job under one written price, backed by the 365-Day Done Right Promise.
Call (844) 761-7521 and a live person answers, day or night. You’ll get a written price before anyone picks up a tool, and our technicians have up to 19 years of experience tearing out cast iron tubs, framing new shower pans, and re-tiling in Arlington homes that were built across six decades of very different construction methods.
This is a sub-service of our Bathroom Remodeling in Arlington work, so if the rest of the room needs attention, it happens in the same visit.
Key Takeaways
- Most Arlington tub-to-shower conversions land between $4,800 and $11,500, all-in with a written price.
- What drives the price: pan type, tile choice, valve replacement, and whether the drain relocates.
- Waterproofing is where cheap conversions fail – Schluter membrane and a pre-sloped pan are standard on ours.
- Behind an old tub, expect to find surprises in a house built before 1980. The written scope handles them.
- No change proceeds until you sign the change order – that’s Clause 1 of The Haven Standard.

When You Need Tub-to-Shower Conversion
Most Arlington homeowners don’t think about their tub until it stops working for them. Here are the scenarios we see most.
- Mobility changes. A step-over tub becomes a hazard for a parent recovering from surgery. A low-threshold shower with a curb under four inches clears that problem in one tore-out-and-replace.
- The tub is never used. In Arlington’s 1970s and 1980s stock – think the neighborhoods off South Cooper Street and down toward the Green Oaks corridor – a second bathroom gets a tub nobody has sat in for a decade. Converting to a walk-in shower uses the same footprint and gains a usable room.
- Water intrusion behind the tile. Arlington’s clay soils shift, and the older cast-iron tubs installed in the 1960s often develop a slow leak at the drain gasket. By the time the grout line cracks, the backer board is soft. We’ve opened walls behind tubs on Randol Mill Road that had wet drywall from a drip you couldn’t see. That’s a membrane problem, and it’s exactly what a conversion solves.
- Cracked or chipped cast iron. A porcelain chip on a cast-iron tub is a cosmetic nuisance, but the rust underneath spreads. A full conversion is often cheaper over 10 years than refinishing twice.
- You’re selling. Buyers in the Arlington ISD attendance zone, particularly around the new construction near Viridian and the older homes in Dalworthington Gardens, read “walk-in shower” as a modernization line item. It’s one of the highest-return bathroom updates for the money.
- The tub is too small. Standard Arlington tubs from the era are 60 inches – fine for a five-footer and cramped for two. A 48-inch shower pan in the same corner reads as more room.
Our Tub-to-Shower Conversion Process
Here’s the sequence on a typical Arlington conversion. The scope is written before step one, and the photo record starts on arrival.
- Written scope and flat price. We measure the existing tub, the drain location, the valve rough-in, and the wall substrate behind the tile. You get a flat written price and a written scope – the tub’s removal, the pan, the membrane, the tile, the valve, the trim. No “call for a quote” line. That number is what you pay unless you sign a change order.
- Tear-out and inspection. The old tub, surround, and any rot come out. We photograph what we find behind the wall – the drain line, the studs, any water damage – and show you the photo record before work continues. If we find something the scope didn’t anticipate, we don’t guess at a price. The change order gets written and you sign it before we touch it.
- Plumbing rough-in. The drain relocates to the shower pan’s center, and the valve gets replaced with a pressure-balance or thermostatic valve. On a tub-to-shower conversion the valve is not optional; a tub spout valve doesn’t control temperature the way a shower valve must. Grohe and Toto are the two we install most, and both come with a written manufacturer warranty that we pass to you.
- Waterproofing. This is the step most cheap conversions skip. We use Schluter’s membrane system – a bonded waterproof sheet over a sloped mortar bed – so water drains to the weep holes on the drain flange rather than soaking into the substrate. In Arlington’s humidity, a shower waterproofed with cement board and a paint-on membrane at the seams is a mold farm waiting to happen. Schluter’s system is a tested assembly with a written spec, not a brand claim.
- Tile and finish. Porcelain or ceramic wall tile, a pan liner, a curb, a niche if the framing allows. You choose the tile and we set it. The written price covers the labor and materials; the tile allowance is a line item, so you can see what’s in there.
- Documentation and handoff. Photo record of the finished job, the written warranty, and a walkthrough of how the drain trap works and what to do if the shower starts backing up. The 365-Day Done Right Promise is printed on the paperwork and backed by the terms page, not by an asterisk.

Tub-to-Shower Conversion Pricing in Arlington
Here are the ranges we quote in Arlington. These are all-in numbers: tear-out, plumbing, waterproofing, tile, finish, and the written warranty. Arlington’s pricing runs slightly above the DFW metro average because of the age of the housing stock in the older neighborhoods and the clay-soil permitting quirks.
| Scope | Typical Price Range | What It Covers |
|---|---|---|
| Basic conversion, same drain location | $4,800 – $7,200 | Acrylic or fiberglass pan, ceramic tile to 6 feet, new trim kit, standard valve |
| Mid-grade with Schluter membrane | $7,200 – $9,800 | Tiled pan, Schluter waterproofing, porcelain tile, Toto or Grohe valve, niche |
| High-end tiled shower | $9,800 – $14,000 | Custom tiled pan, large-format tile, frameless glass, bench or niche, thermostatic valve |
| Drain relocation (if needed) | Add $600 – $1,400 | Moving the drain center to the shower pan’s position |
| Unexpected water damage | Change order, quoted in writing | Rot repair, subfloor, reframing – the number in the change order, signed before work |
What moves the number within those ranges: the tile allowance (porcelain runs roughly $4 to $12 a square foot; natural stone runs higher), the valve choice, whether you want frameless glass, and whether the drain relocates. There’s also a small line item for the trim-out, because a tub-to-shower conversion has to close off the old tub surround’s footprint with a finished wall.
If you have a written estimate from another contractor, bring it in. The Free Second Opinion is exactly that – we read your competitor’s quote line by line, at no charge, and tell you what’s missing from the scope. You’ll know where the “plus extras” will show up before you sign.
Call (844) 761-7521 for a flat written price on your Arlington conversion. Estimates are free, and the price arrives before anyone starts.
FAQs – Tub-to-Shower Conversion
How long does a tub-to-shower conversion take in Arlington?
A standard Arlington tub-to-shower conversion takes 5 to 8 working days from tear-out to handoff, depending on tile dry time and whether the drain relocates. A basic acrylic-pan conversion runs 4 to 5 days; a fully tiled shower with a Schluter membrane and a bench runs 7 to 9. The photo record documents each day, and we notify you by text at each milestone. Call (844) 761-7521 and we’ll give you a schedule with your written price.
Is it cheaper to repair my tub or convert it to a shower?
It depends on the tub’s condition, but in most Arlington cases a conversion is the cheaper long-term move. Refinishing a cast-iron tub runs $500 to $900 and lasts 5 to 10 years before the coating peels again; a full tub-to-shower conversion runs $4,800 to $11,500 and solves the underlying drain and substrate. If the tub is intact and you simply want a different look, a refinish is a reasonable short-term answer. If water is getting behind the surround, converting is the cheaper fix over 10 years. Call (844) 761-7521 for a written price on either path.
Do I need a permit for a tub-to-shower conversion in Arlington?
Yes. A tub-to-shower conversion requires a plumbing permit in the City of Arlington because the drain and valve rough-in change, and the work is inspected. We pull the permit for you and the inspection is included in the written price. Skipping the permit leaves an unpermitted shower that shows up on a buyer’s inspection report and can cost you more at resale than the permit fee. Call (844) 761-7521 and we’ll walk you through what the city inspector will check.
Can you handle a tub-to-shower conversion if I have a walk-in tub or a garden tub?
Yes, and both arrive with their own quirks. A garden tub usually means a deck surround and a wider footprint, so the conversion includes closing off the deck and resetting the shower pan within the tub’s original opening. A walk-in tub’s door mechanism and drain gasket are the two failure points, and removing one means capping a side drain that isn’t always where a shower pan needs it. We’ve converted both types in Arlington, and the written scope names the deck, the drain, and the valve. Call (844) 761-7521 to schedule a measure.
For a full bathroom refresh rather than a single shower swap, our Bathroom Remodeling page walks through the parent scope. We handle the conversion as one written job with one photo record, one flat price, and one written warranty, and the same crew that waterproofs the shower sets the tile and finishes the trim.
Call Rowan Construction Group Arlington at (844) 761-7521 for a free estimate on your tub-to-shower conversion. A live person answers 24/7, and your written price arrives before anyone picks up a tool.
Written by the team at Rowan Construction Group Arlington, serving Arlington.


